The problem, defined
You've bought a Victorian West Cliff terrace. You've bought an EV. You want a home charger. The consumer unit is where the Victorian house always puts it: on the wall under the front stairs, near the front door. The driveway is either a short front driveway blocked by a bay window from a direct cable route, or a rear driveway 15-plus metres away round the back of the house past a chimney breast and a kitchen extension. Neither of those routes is a 30-minute install.
Route A: under the stairs, through the party wall
Front-driveway installs where the bay window blocks a straight run: we come out of the consumer unit into the underside of the stairs void, up into the loft, across the front bedroom ceiling void, down the front elevation inside a hidden service duct we form behind the bay column, and out at low level near the driveway bay. That's a full day of work plus a survey visit. On a Grade II listed West Cliff villa, the loft-to-void section needs conservation-officer sign-off - we take that conversation first.
Route B: through the house, out the back
Rear-driveway installs are usually longer but often easier. Consumer unit to under-stairs, along the party wall skirting or above the coving, into the kitchen extension roof void, out through the extension wall in a hidden gland-and-duct arrangement, along the rear boundary wall to the driveway. 15-25 metres of cable in a mix of clip-and-conduit inside and steel-wire-armoured (SWA) outside. Half a day to a full day.
Route C: sub-board at the driveway
When the run is over 25 metres or the property has more than one consumer unit already, we sometimes propose a dedicated sub-board at the driveway, fed by a proper 40A or 63A SWA sub-main from the meter position or from an upgraded meter tail. That gives you a clean isolation at the point of use and future flexibility (second charger later, outbuilding supply, garden lighting). Adds £300-500 to the install but often the tidiest long-term answer.
What we won't do
Surface white PVC trunking along the entire front elevation of a Grade II listed Nelson Crescent villa. Ever. Not just because it looks appalling - because it's a Listed Building Act breach and it puts the owner in a position where the enforcement notice is bigger than the cost of doing it properly.
What the survey looks like
We come round for 30 minutes, take photos of the consumer unit position, the meter position, the driveway or bay, and the intended cable route candidates. We lift a floorboard if we need to check void continuity. We tell you which of the three routes fits, what it costs fully inclusive, and how many days the property will be dust-adjacent. WhatsApp us photos first if you want a ballpark before we visit.
Want a Ramsgate quote?
Send a photo and a postcode. Get a fixed price or WhatsApp us.